Showing posts with label TVA. Show all posts
Showing posts with label TVA. Show all posts

Friday, September 17, 2010

Hey TVA: Have You Read Your Mission Statement Lately?

Amazingly, TVA had no legal obligation to keep this from happening!

I guess this is some kind of legal maneuver over “standing” or some such (I don’t know, I’m not a lawyer), but apparently the Tennessee Valley Authority’s lawyers claim that 58 people suing over the Kingston coal ash spill were not harmed by their 1.1 billion gallons of toxic coal slurry spill back in December 2008.

The money quote is this:
The motion filed in Knoxville said TVA has no legal obligation to keep its reservoirs safe for public recreational use and enjoyment.

Really? You so sure about that?:

Mission Statement

The mission of the Tennessee Valley Authority is to develop and operate the Tennessee River system to improve navigation, minimize flood damage, and to provide energy and related products and services safely, reliably, and at the lowest feasible cost to residents and businesses in the multi-state Tennessee Valley region. TVA’s integrated management of the entire Tennessee River watershed optimizes the benefits of the water resource. Major functions of the corporation include:

• Management of the Tennessee River system for multiple purposes including navigation, flood control, power generation, water quality, public lands conservation, recreation, and economic development;

• Generation of electricity;
• Sale and transmission of electricity to wholesale and large industrial customers;
• Stimulation of economic development activities that generate a higher quality of life for citizens of the Tennessee Valley;
• Preservation and environmentally-sensitive management of TVA assets and federal lands entrusted to TVA; and
• Research and technology development that addresses environmental problems related to TVA’s statutory responsibilities for river and land management and power generation.

Again, I'm not a lawyer, but it sure sounds to me like TVA has a legal obligation to keep its reservoirs safe for public recreational use and enjoyment. We're always hearing about TVA's tri-fold mission of power generation, economic development and natural resource management. It's something they tout everywhere, including places like this:

What is TVA?

The Tennessee Valley Authority is a federal corporation and the nation’s largest public power company. As a regional development agency, TVA supplies reliable, competitively priced power, supports a thriving river system and stimulates sustainable economic development in the public interest. TVA operates fossil fuel, nuclear and hydropower plants, and also produces energy from renewable sources. It manages the nation’s seventh-largest river system to reduce flood damage, produce power, maintain navigation, provide recreational opportunities and protect water quality in the 41,000-square-mile watershed.

I realize lawyer-types like to weasel their way around the law by saying things like "our client has no legal obligation to keep its reservoirs safe for public recreational use and enjoyment," leaving us all to assume that whatever river and land management they've done up to this point has been out of the goodness of said clients' hearts. But having worked for TVA in a former life and constantly having their trifold mission drilled into my head I am thinking ... no. I have to say all of us in the Tennessee Valley are certainly operating under the assumption that there is a legal obligation to manage the river system for things like recreation which, let's face it, is a key part of the economic development picture.

But again, I'm not a lawyer. I will say this: if the courts agree that TVA has no legal obligation to keep its reservoirs safe for public recreational use and enjoyment, then the first order of business should be amending the TVA Act to make sure that they do.

Thursday, September 9, 2010

Turning A New Leaf

[UPDATE]: Just in the nick of time, too.

---------------------------

Sorry, the headline is lame, I’m still on my first cup of coffee (which is how most of my posts are written), but I find this very exciting news:
State officials hope to give a boost to electric car sales with a $2,500 incentive to early buyers of the Nissan Leaf in Tennessee via a program that could later be extended to buyers of other alternative fuel vehicles.

Gov. Phil Bredesen, speaking during a TVA conference on electric vehicles Wednesday, said the state plans to tap a petroleum escrow fund marked for energy projects to provide rebates of $2,500 to the first 1,000 buyers of the new Nissan Leaf electric car later this year.

"There's no reason Tennessee can't take the lead … in the development of electric vehicles," the governor said. "We want their components to be made here and sold worldwide with a 'Made in Tennessee' label."

The $2.5 million state program, which provides perks on purchases in addition to generous federal incentives to buyers of electric cars, makes Tennessee at least the second state with such extra benefits. California has a $5,000 incentive for buyers of all-electric, plug-in vehicles.

I might as well ‘fess up and let everyone know I’ve been on the waiting list for the Nissan Leaf for the past five months. I work from home so it’s perfect for someone like me: My driving is mostly around town doing errands, going to hockey and football games, shopping, etc. I have solar panels on my roof so I won’t have to feel too guilty about the electricity I’m using for fuel. And our garage is perfect for installation of a home charger. Mr. Beale already drives a Nissan but his car was getting some mileage on it. So we’ll trade it in for a Leaf, and we’ve got the hybrid if we need to drive further than 100 miles, which is maybe eight times a year.

Anyway, I’m excited about the new incentives. There’s so much right about this program, not the least of which is the fact that these cars are made right here in Tennessee. I love that I'm creating jobs for my neighbors and also helping the environment.

I know our state gets a bum rap for a lot of the silly stuff we do, but the Tennessee EV program is actually quite advanced. We’re actually way ahead of states like Vermont and Oregon and whatnot, states one usually assumes to be green and progressive. We’ll have a network of charging stations so I could, actually, drive my EV all around the state (and perhaps I will and blog about it):

Jonathan Read, CEO of San Francisco firm ECOtality, said Tennessee would be the first state to take the electric vehicle beyond the 100-mile range that is rapidly becoming the standard for all-electric mass-production vehicles like the forthcoming Nissan LEAF and Ford Focus Electric expected next year.

He said: “With these plans completed, the state of Tennessee will emerge as a leader in EV adoption, and serve as a critical blueprint for how best to connect major population areas with EV infrastructure.

“We are thankful for the input TVA and our partners in each city have provided throughout the planning process. We are taking a smart and strategic approach to the deployment of EV infrastructure so as to best create a connected, highly functional EV charging network,” added Mr Read.

Kim Greene, president of Strategy and External Relations at TVA, said there was a “groundswell of enthusiasm” already growing in the TVA area and the entire state as a result of The EV Project.

I’m just so proud of our state for being leaders in this critically important area. I’m proud of TVA and I’m proud of Gov. Bredesen.

And I’m worried. Just a teensy weensy bit worried. Because here’s the thing that’s so radical about EVs: no internal combustion engine! Wrap your head around that one for a minute. That means no tailpipe. That means no gas station stops -- ever. No need for fill-ups. No need for oil changes. Nada.

The only reason you will ever need to stop at a gas station is to buy a soft drink. And think about how Mr. Haslam’s family makes its money: gas stations. So, if Bill Haslam is our next governor (and it's looking likely) I do have a concern that he will self-servingly try to obstruct this program. It’s mostly a federal program and he can’t mess with it too much, I don’t think, and it looks like it may be too far along for him to screw it up even if he wanted to, but I think it’s a fair question.

Having seen the excellent documentary “Who Killed The Electric Car?” and seen how politics can destroy a pilot program (especially when the corporation behind it isn’t fully on board) I think my fears are justified.

In California, people literally were trying to hide their EV’s from GM. The auto maker went around and repossessed every car it could find when Bush's EPA challenged the state's air quality law which created the market for EVs. Eventually every EV was crushed. Stupidly, of course, but they did it. It was about politics, nothing more, and GM paid for its stupidity and short-sightedness. Let’s hope they learned a lesson because the EV ain’t dead, it’s alive and well and the wave of the future.

And I am just putting Nissan and Bill Haslam and the oil lobby on notice: not again. From my cold, dead hands, people.

Thursday, June 24, 2010

Good News, Bad News

First, the good:
KNOXVILLE — TVA is reversing course and resuming new enrollments in its Generation Partners pilot project to encourage renewable energy use throughout its service territory after being criticized by area alternative energy contractors.

The federal utility made the announcement this afternoon after meeting with contractors who have complained that TVA’s recent decision to suspend the Generation Partners program will harm their business.

This is great news. Momentum continues to build for alternative energy in the Tennessee Valley, and TVA has decided to stick with its successful, though modest, incentive program. It only makes sense; as was pointed out here, TVA is spending $3 billion cleaning up the Kingston Fossil Plant’s coal sludge spill, yet devotes just $50 million to its solar program. Sorta like BP spending $20 billion to clean up the Deepwater Horizon mess, when it could have spent $500,000 on a blowout preventer. Very, very stupid.

Now, the bad news:

But about three miles off the coast of Alaska, BP is moving ahead with a controversial and potentially record-setting project to drill two miles under the sea and then six to eight miles horizontally to reach what is believed to be a 100-million-barrel reservoir of oil under federal waters.

All other new projects in the Arctic have been halted by the Obama administration’s moratorium on offshore drilling, including more traditional projects like Shell Oil’s plans to drill three wells in the Chukchi Sea and two in the Beaufort.

But BP’s project, called Liberty, has been exempted as regulators have granted it status as an “onshore” project even though it is about three miles off the coast in the Beaufort Sea. The reason: it sits on an artificial island — a 31-acre pile of gravel in about 22 feet of water — built by BP.

Well that’s special. BP doesn’t exactly have a proven track record, yet they were allowed to dump a 31-acre pile of gravel in the water to classify their risky, untested drilling operation as “onshore”? That just screams Bush Administration-style shuck and jive, doesn’t it?

It gets worse:

Rather than conducting their own independent analysis, federal regulators, in a break from usual practice, allowed BP in 2007 to write its own environmental review for the project as well as its own consultation documents relating to the Endangered Species Act, according to two scientists from the Alaska office of the federal Mineral Management Service that oversees drilling.

The environmental assessment was taken away from the agency’s unit that typically handles such reviews, and put in the hands of a different division that was more pro-drilling, said the scientists, who discussed the process because they remained opposed to how it was handled.

“The whole process for approving Liberty was bizarre,” one of the federal scientists said.

The scientists and other critics say they are worried about a replay of the disaster in the Gulf of Mexico because the Liberty project involves a method of drilling called extended reach that experts say is more prone to the types of gas kicks that triggered the explosion on the Deepwater Horizon.

I’m sorry, but why are we allowing this to move forward? Now that we know BP ain’t exactly honest brokers here, that their accident “response” plan for the Gulf of Mexico included such impossible scenarios as walruses in the Gulf of Mexico, that they cut corners and were blinded by the dollar signs in their eyes. That pretty much proves they aren’t paying close attention to stuff like safety and environmental protection. And we're going to let yet another "never been done before" drilling operation move forward?

I've said it before a thousand million gazillion times but I'll say it again: the easy oil is gone. All that's left are oil reserves that are more difficult, more expensive, and riskier to tap. This means for a company like BP to make money, they will cut corners and they will take unnecessary risks. Their business model depends on it.

Look, now that we know what we know, it is unconscionable to allow this project to move forward without, at the very least, a more thorough review of safety and risks. C’mon, people. Don’t be stupid.

Saturday, June 19, 2010

The Future Is Now

I read stories like this and I just have to shake my head at how short-sighted we all are:
TVA program that spurs solar installations put on hold

Generation Partners not taking new participants


TVA’s popular program that pays homeowners and businesses to generate electricity from solar energy has hit a wall.

Much of the $50 million set aside for the Generation Partners program has been committed as applications from even more would-be participants stack up.

Costly, mega projects by opportunistic investors may be eating up the money — versus smaller solar installations by homeowners or businesses that need the power themselves and for whom the program has been largely pitched.

Tennessee Valley Authority officials told a group of distributors that administer the program through formal agreements on Wednesday that a moratorium was being imposed.

Got that? Those “opportunistic investors” (I’m sorry, is there another kind? Altruistic ones, perhaps?) are sucking TVA dry of solar funds. So they will have to put a moratorium on the solar program because it’s just too darned successful.

Which just makes me wonder: when, yea Gods, will renewable energy finallly be able to prove it’s competitive in the marketplace? [/Snark]

Yes, I am being sarcastic. Yes, I know solar is subsidized. Guess what, so are fossil fuels. So is coal. It's all subsidies. What the hell was the Interstate Highway System but one big subsidy to oil companies, refineries and the automobile industry? What is the Strategic Petroleum Reserve but a giant taxpayer-funded subsidy to Big Oil?

When you privatize the gains of offshore oil drilling and mountaintop removal mining but socialize the losses in the form of a destroyed Gulf Coast, ruined mountains, acid rain, poisoned streams, lung disease, lost fishing and tourism industry etcetera etcetera, that is a freaking subsidy. Just sayin’.

And that’s not including actual, you know, subsidies that Senators throw hissy fits over when you take them away. Why are taxpayers putting $2.3 billion in coal subsidies?

But back to our story:

Steve Johnson, with LightWave Solar Electric, is worried about the program ending.

It has helped his company grow over the last few years from one person to 18, with a new hire coming in next week.

Without the various solar incentives — Tennessee state government doesn’t offer any for residences — jobs will likely be lost and the fledgling industry could start to slide, he said.

“They’re spending $3 billion cleaning up from coal,” Johnson said, referring to money spent on TVA’s Kingston coal ash spill and re-tooling its other ash sites.

“This $50 million is a drop in the bucket. It would be nice if we had a $3 billion budget because we would actually be producing electricity with it — cleanly.”

In the interest of full disclosure, as many of you know I am a Generation Partner and Lightwave installed my array. They are good people, and this is a good program. I hope TVA is true to its word and the moratorium is, indeed, temporary.

I just don’t understand why we are spending so much money propping up a dead, polluting, environmentally destructive energy system. Especially when it’s obvious that people want solar power. They want to get in on the new thing that is the wave of the future. Why are utilities putting up obstacles?

With every passing day it is more obvious that fossil fuels are an outmoded, old fashioned, inefficient, dying energy source. The future is in renewables and it’s happening whether TVA or politicians or anyone else likes it or not.

Here’s yet another example of how I know I’m right. Read this article about BP’s former refining chief Cynthia Warner--a Vanderbilt grad, I may add--who left BP in 2009 and is now president of Sapphire Energy, a company which makes liquid hydrocarbons from algae. Why?

"I had a slow but growing realization that the industry was maturing, the current fields were falling off in volume more quickly than anticipated, and the feats required to find new oil were becoming more and more heroic."

[...]

"I had an epiphany that if I was going to put so much personal energy into making something happen, it was a lot better to create the key to the future than to nurse along the dying past." What motivated her above all was her two kids, a feeling she describes in a typically homey metaphor: "What I want to do is leave a legacy for my kids where energy is secure. I don't want them to have to go out and fight for it -- I don't want to leave them a world where we're fighting for the last slice of the pie, but one where we're baking new pies."

I’m not advocating renewable liquid hydrocarbons--frankly I don’t know enough about it, though I am intrigued at the idea of finding a renewable source of hydrocarbons for all of those plastics we use--I’m just saying: when people who work for the oil companies are leaving because they see it's a dead-end industry, folks it’s a dead end industry.

Change is happening people, because it just makes economic sense. Climb aboard or be left behind.

Monday, August 31, 2009

Choosing Between Poverty & Poison

I’m watching a re-run of CBS 60 Minutes’ piece on toxic e-waste sent to China. This quote from Jim Puckett of watchdog group Basel Action Network resonated:
“It’s a helluva choice between poverty and poison. We should never make people make that choice.”

Damn straight. It’s what we’re talking about when we discuss “environmental racism” and “eco-justice.” It’s also little different from how we are dealing with the toxic coal ash from last year’s Kingston Fossil Plant spill, save by degrees. Indeed, the toxic coal ash from Kingston is now being hauled to a landfill in economically depressed, predominantly African American Perry County, Ala. And it’s causing a rift in that community because we’ve basically asked those folks to make a choice we never should have burdened them with.

These stories always seem to follow the same pattern. On the one hand there is the lure of money and jobs:

A per-ton “host fee” that the landfill operators pay the county will add more than $3 million to the county’s budget of about $4.5 million.

The ash has created more than 30 jobs for local residents in a county where the unemployment rate is 17 percent and a third of all households are below the poverty line.

Money is great but short term profits are not worth long term environmental and health damage, say many in the community:

“I won’t feel comfortable,” wrote W. Compson Sartain, a columnist for The Perry County Herald, “until I see a delegation from E.P.A. and T.V.A. standing on the courthouse square, each member stirring a heaping spoonful of this coal ash into a glass of Tennessee river water this stuff has already fallen into, and gargling with it.”
(Sartain might be interested in United Mountain Defense’s challenge to “clean coal” pitchman/sport fisherman Jeremy Starks, as well.)

And, as always, there is a general lack of education and information about the risks:
Mr. Cureton reasoned that the ash, a byproduct of burning coal to produce electricity, could not be more dangerous than the remnants of the coal that heated his schoolroom growing up, or the ash his father, a farmer, sprinkled at the base of his fruit trees.

But coal ash from a power plant has a higher concentration of toxins because mercury, arsenic and other substances that are filtered out by air pollution controls end up in the ash. Since the spill in Tennessee, the Environmental Protection Agency has promised to issue new regulations for coal ash, potentially classifying it as a hazardous waste.

People like Mr. Cureton, who I have no doubt is sincere in his efforts to do the best for his community, are why issues of environmental racism and eco-justice are so pernicious. But I’d remind these people that there is no such thing as a free lunch. And if taking this coal ash waste were such a great thing, well, we’ve got some landfills here in Tennessee, in counties that could use those jobs and that money. Gotta ask yourself why we’re shipping it out of state to begin with.

Of course, none of this would be an issue if “clean coal” were as “clean” as the coal lobby likes to pretend.

I use the pronoun “we” for a reason in this post. Because this is our mess. We all created it, in our use electricity. Of course, we have few choices if we’re going to live a normal life in this culture. But there are things we can do. We can conserve. We can sign up for programs like TVA’s Green Power Switch. And some of us can help generate alternative fuels by putting solar panels on our roofs.

And maybe in this way we can bring some justice and jobs to our neighbors, instead of dumping our toxic trash on them.

Because we should never ask anyone to choose between poverty and poison so we can prosper and live in comfort.

Tuesday, July 21, 2009

Report: Big Problems At TVA Coal Ash Sites

Can’t say we didn’t see this one coming, but at least it’s now official:
Consultants hired by the Tennessee Valley Authority report widespread problems with how the federal utility is running and maintaining its coal ash storage operations.

By the way, TVA is not just a "federal utility," it is a federally owned corporation. But I digress:

The report by McKenna Long and Aldridge of Atlanta follows the massive spill of more than 5 million cubic yards of coal ash December 22 at the Kingston Fossil Plant about 40 miles west of Knoxville.

The consultants said the "necessary systems, controls and culture were not in place" to properly manage the coal ash sites at TVA's 11 coal-fired power plants.

The report found TVA had no standard operating or maintenance procedures and failed to conduct annual training for engineers doing inspections. It said there was little or no internal
communication between the four TVA divisions responsible for ash retention.

The firm presented its findings to the TVA board Tuesday.

Hmm, with that in mind, I remind everyone that last February TVA shuffled its executive staff around, moving former coal operations chief Preston Swafford to head TVA’s nuclear operations.

Let’s hope Mr. Swafford manages TVA’s nuclear waste better than he did its coal ash.

Thursday, June 25, 2009

Green Light

This morning I received a phone call from Nashville Electric Service informing me that the issues putting NES and TVA at odds have been, if not resolved, at least worked out sufficiently that Generation Partners have been removed from the equation.

In other words, our solar panels are no longer caught up in green tape! We can sign a contract to begin generating green power off our roof and feed it to the electrical grid.

Apparently NES and TVA are giving themselves a 6-month window to hash out the most problematic of their issues, so things still aren’t 100% resolved. And Lightwave Solar was out at the house this morning switching something around which, mid-way through, they learned they would need to switch back when NES changed its mind about something technical. So there are still some problems to be worked out. But the bottom line is, people like us are no longer stuck in the middle of that dispute and can sign our contracts.

This is terrific news and I cannot wait to get my solar panels commissioned! I send out heartfelt thanks to Steve Johnson at Lightwave Solar, Christian and Jamey at The Mighty Deuce, ACK at Post Politics for linking to my first blog post about this, and most of all: NES and TVA for working out a solution!

Thank you everybody! And now: to the green future .... and beyooooooond!!

Tuesday, June 23, 2009

Caught Up In Green Tape

It seems I’ve hit a speed bump on the road to a clean energy future. As I’ve read absolutely nothing about this in our local news media, I thought I’d better say something here to let folks know what is happening in this obscure corner of the new energy economy.

As many of you know, we’ve installed a not-insignificant solar array on the roof of our house. Supposedly ours is larger than the Gores, not because our roof is larger but because we don’t live in Belle Meade and I understand they have more stringent zoning rules than we do in Nashville.

Anyway, we’re at the point of commissioning our system, which is where we sign our contract with NES to lock in a price at which the distributor buys our power. We are basically power producers, which I think is really cool.

However, we’ve hit a snag. It seems TVA and Nashville Electric Service are at odds over TVA’s new Generation Partners contract, and it’s left folks like us in the middle.

The good news is that the new contract is much more favorable to Generation Partners: we get a $1,000 signing bonus and receive our base rate plus 12 cents for every kWh we produce, which would add up to nearly 21-cents a kWh. This also means that what we are paid goes up if rates go up, because it’s base-plus. I love this deal!

The new contract goes into effect July 1 but NES has not signed on as of yet. I don’t really understand all of the issues preventing NES and TVA from coming to terms; it’s complicated and seems to relate to reimbursements for things like inspections, maintenance of meters, data lines, etc. None of the issues relate to us as a Generation Partner, it’s more of a headache for the people involved in installations at this point. However, the fact that NES and TVA can’t resolve their differences is keeping us from firing up our system.

I’m not the only one in this holding pattern, either; there are quite a few of us Generation Partners ready to start feeding the grid with clean, green energy but we haven’t signed our contracts yet.

So to deal with us, NES has told us we can sign on under the old Generation Partner contract: this one offers a $500 signing bonus and a flat rate of 15-cents per kWh generated. When (if) NES signs its new contract with TVA, NES will offer us reimbursement under the new rate structure (base + 12-cents), and sign a new 10-year contract with us.

This may sound like a good compromise but it’s not. For one thing, we are out the extra $500 in the signing bonus. And, here’s the real kicker: TVA told me all Generation Partners have to convert to the new contract by Sept. 30 or we are SOL. But Generation Partners have little to do with whether or not we can sign the new contract, that’s between TVA and their distributors! So why penalize us?! I’m ready to sign the new contract now, today, right this second. But I can’t because NES hasn’t climbed on board yet.

So, worst-case scenario, NES could drag its heels and not sign a contract by Sept. 30 and we Generation Partners are left out of TVA’s new rate structure for good. And right now, neither NES nor TVA nor anyone else can tell me when the two parties will come to terms. I could sign the old contract today and tomorrow NES and TVA will have resolved their differences and I’m out $500 for nothing. Or, I could wait, missing out on months of prime summertime solar power generation, only to arrive at a Sept. 30 deadline with nothing to show for it.

I’m not meaning to portray anyone as the bad guy here because both TVA and NES have been really great about answering my questions and trying to be as helpful as they can under the circumstances. But TVA gave its distributors a year to figure this out, and I’ve been told there are still 33 issues that need to be resolved.

Here’s the deal: I’m just a tiny little cog in the great wheel of the new energy economy, but if I could hit a snag this early in the game, it doesn’t bode well for the future. So figure it out, guys and gals.

The governor of Tennessee is seeking major investment in solar energy for the state. We’ve heard talk of Tennessee becoming the “Silicon Valley of Solar.” I just have to say: that ain’t never going to happen as long as major players like TVA and NES can’t come to terms on a Generation Partners contract after an entire year. I mean come on, people: this just looks bad.

Mr. Beale and I are not doing this for the money. We are doing this for Tennessee, for the economy, for the environment. We are doing this so I don't have another toxic coal ash spill or leveled mountain on my conscience. That said, we don't wish to be penalized because TVA and NES can’t figure out a contract.

Solar panels are not cheap, and unlike some states, there’s precious little in the way of incentives currently offered to residential producers like us here in Tennessee. We held up our end, investing an enormous chunk of our own money to begin generating clean solar power. Now I expect my “partners” to hold up their end and hammer out a freaking contract already.

So get down to it, folks. Time's a wasting.

Thursday, March 19, 2009

Memory Hole: Bonus Edition

[UPDATE]:

According to ACK, Marsha Blackburn was the only Tennessee Congress Critter to vote against the bonus tax.

Shocking.
-------------------------------

I’m really glad people are pissed off at those greedy AIG executives, and I have no problem with the House slapping a big fat tax on their bonuses (though I’d love to know who the 93 holdouts were). I did find this interesting:
In all, 243 Democrats and 85 Republicans voted "yes" on the bill. It was opposed by six Democrats and 87 Republicans.

Curious.

Meanwhile, Republicans take petty to new heights:

"He flies off to Los Angeles to be on the Jay Leno show," Senate Minority Whip Jon Kyl (R-Ariz.) said this morning, referencing the president's appearance tonight on NBC's "Tonight Show."

"He's even found time to fill out his NCAA bracket," added  Sen. Lamar Alexander (Tenn.), the No. 3 Republican leader.

Oh, please. It’s not like he was on vacation for a whole week while an entire U.S. city drowned.

Indeed, this seems like a great opportunity to remind everyone of the fat bonuses TVA’s CEO and board received despite the coal ash spill that will cost hundreds of millions to clean up, and which ratepayers will pay for, even though it was the fault of TVA bean counters who opted for the cheap fix, as their “business model“ mandated. Remember, it’s always about profits.

I realize a $1 million bonus isn’t the same as $165 million in bonuses, and sinking a little town in east Tennessee in toxic sludge isn’t the same as flushing the entire U.S. economy down the toilet. Still, it’s helpful to remember that quite a few people have had their lives ruined while a select few were rewarded, taking home big bonuses which you and I are paying for.

And that happened right here at home. No one ever threatened to tax that money. Not even Lamar Alexander.

Just sayin' ...

Thursday, February 5, 2009

What Could Possibly Go Wrong?

Is this supposed to make us feel better?
The Tennessee Valley Authority is reshuffling its executive staff, in part to help respond to the challenges of cleaning up the ash spill at the Kingston Fossil Plant, the utility announced today.

Preston Swafford, formerly head of TVA’s coal operations, will become TVA’s nuclear chief, the utility said. Mr. Swafford replaces Bill Campbell, who is being named to a new position over engineering operations.

WTF?

So the executive who was over TVA’s coal operations during this whole toxic ash spill mess has been moved to the nuclear power division?

Is this a joke?

Look, I have no idea what Preston Swafford’s involvement in the Kingston coal ash spill was, but I've always suspected that repairs to the leaky coal sludge pond were done on the cheap at the behest of TVA bureaucrats, not Kingston plant management (and yes, I blogged about it last month).

If that was Swafford’s call, he should be fired, not promoted. And he definitely shouldn’t be put in charge of a power generating division that poses even higher risks to public safety than a coal plant.

(h/t, R. Neal)

Wednesday, January 28, 2009

Hello, EPA? Tennessee Calling

This is the stupidest thing I’ve ever heard:
Tennessee Congressmen Zach Wamp and Lincoln Davis are hoping to bail out TVA by asking for a $25 million federal welfare package to subsidize cleanup of the agency's recent toxic ash spill.

The two congressmen want the money to come from President Obama's stimulus package, a Rooseveltian public projects scheme designed to beef up the economy. But while bailouts are all the rage these days--and the congressmen are only trying to help TVA customers, who'll pick up the tab for the agency's negligence--the move looks suspiciously like pork. Simply having the feds pick up the tab won't create any new jobs.

I’ll ignore Kotz’ ridiculous assertion that all federal spending is somehow “welfare” or “pork.” What I don’t get is why the Kingston coal ash site is not eligible for Superfund emergency response funds. That’s what the fund is for: to cleanup after emergencies,

such as fires, train derailments, and floods, involving the release of hazardous substances.

I also don’t understand this letter I received from Sen. Bob Corker:

I have talked directly with Roane County Mayor Mike Farmer and TVA CEO Tom Kilgore and assured all involved that I will support appropriate measures at the federal level, however I am opposed to spending federal taxpayer money to support cleanup efforts at Kingston. There's been an effort through the years to cause TVA to be a self-standing entity, to have a corporate-like board and to run independently.  I think when we start seeking federal dollars to deal with TVA, we start a process of unwinding something that took several years to put in place. In meetings with TVA though, I have asked for and received assurance from them that they will make every effort possible to limit the burden on TVA ratepayers and ensure that those affected by this incident are taken care of and their homes, property, and livelihoods restored.

Oh, well, I’m sure that everything will be okay, then.

I don’t know what TVA’s “ self-standing,” “corporate-like” structure has to do with the need to protect the environment and the health of those who depend on the air, water and soil in the affected area. Superfund does not distinguish between toxic pollution caused by “corporate” or “government” entities. Tennessee’s Superfund sites include both.

I admit to being a little out of the loop on the current status of the Superfund. Originally the guiding principal of the Superfund was "the polluter pays." I know over the years some of the country’s biggest polluters have tried to roll back the Superfund legislation, and I recall the tax on toxic chemicals which partially funded the program was eliminated back in the ‘90s. I read that the fund is now paid for out of government appropriations, instead of the “polluter pays” rule that had been the program’s hallmark. I’m sure eight years of an industry-friendly EPA under the mismanagement of tools like Stephen Johnson hasn’t helped. But the program is still in existence.

Why can’t the people of East Tennessee make use of it? Why are our representatives in Congress not working with the EPA to ensure this happens?

Wednesday, January 14, 2009

Nobody Could Have Anticipated, TVA Edition

Over at Grist, Peter B. Meyer wonders why TVA didn’t anticipate the coal ash spill.

Meyer’s piece is a little wonky but basically what I think he’s saying is that the cost-benefit analysis approach to projects like, say, repairing a coal ash retention pond is flawed, because it fails to take into consideration all of the possible costs and outcomes, as so many of them are unknowable to begin with. Instead, they just look at the likely costs and outcomes. And in today’s world of advanced technology, likely is not sufficient. Accidents--devastating ones--are the new “normal.” They are not exceptional events.

In other words: shit happens.

I sorta touched on this here, when I mentioned TVA going the low-budget spit-and-a-prayer route to fix the leaky Kingston ash pond, instead of opting for the $25 million “global fix.” As a result of this judgment error, they are at least $100 million in the hole, people have lost their homes, the environment is destroyed, etc, etc.

Meyer writes of TVA’s decision:
So, that tells us the TVA figured the probability of a spill multiplied by the likely cost to clean up was less than $25 million in current dollars in 2003.

They were badly wrong. Why?

The expected value calculation appears to have assigned a zero probability to a spill as massive as the one that occurred. That's as if you carried an umbrella in the rain even though you might melt if you got wet, and assigned a zero probability to the possibility of high winds or hail. That's not rational.

Assigning that zero likelihood also meant that there was no serious effort to calculate the cost of such a massive failure.

With all due respect to Peter Meyer, I think he is being awfully charitable here. I find it difficult to believe that engineers never considered the possibility that the Kingston dam would completely fail, especially after it was already leaking. I also find it hard to believe that someone, somewhere, never put pencil to paper and figured out what cost that kind of devastation would rack up.

I think something else was happening. I think a bunch of bureaucrats--probably in Knoxville HQ or Chattanooga, and probably a few folks in Washington D.C., too--thought it would be better to keep their fingers crossed and whisper the magic incantation they hoped would keep chaos at bay. They knew better, alright. They just hoped they wouldn’t be left in the hot seat when the shit hit the fan.

Isn’t that the way it’s been across virtually every sector of American life for the past ten to fifteen years? Just cross your fingers and hope the piper doesn’t come calling. Keep borrowing money and hope the creditors don’t catch up to you. Keep giving loans to people you know are bad risks, and hope that doesn’t blow up in your face.

Keep putting off repairing levees in New Orleans and hope “the big one” doesn’t come. Keep ignoring PDB’s warning of a domestic terrorist attack. Keep making gas-guzzling highway hogs and hope rising gas prices never come. Keep building bigger McMansions and hope people still have the cheap credit to buy them.

That’s worked so well for us, hasn’t it? “No one could have anticipated” has become our national punchline.

I don’t see why TVA should be any different from the rest of us. And if TVA has been living this way, then you’d better believe your local power utility has been doing the same.

Tuesday, January 13, 2009

Honesty

This video just about broke my heart:

Friday, January 9, 2009

All Of Those Leaky TVA Ponds

Folks, when I said the TVA coal sludge spill wasn’t the first and won’t be the last, I wasn’t kidding. And when I said the Kingston disaster should be coal’s Three Mile Island, I meant it.

Witness this news item from this morning (h/t, reader fuzed-T):
TVA waste pond ruptures in Ala.; spill contained

STEVENSON, Ala. (AP) — A waste pond at a coal-burning power plant in northeast Alabama ruptured early Friday, but the spill was quickly contained, utility officials said.

The spill, about 30 miles southwest of Chattanooga, Tenn., was the second rupture at a Tennessee Valley Authority facility in recent weeks. In late December, a dike burst at a plant near Kingston, Tenn., releasing more than 1 billion gallons of toxic-laden ash into a neighborhood.

The leak was discovered at about 6 a.m. Friday at the plant near Stevenson, said TVA spokesman John Moulton. Most of the material from the leak flowed into a settling pond at the plant site, but some spilled into nearby Widows Creek, he said.

The leak has stopped and the TVA is conducting temporary repairs on the pond, Moulton said.

The federal utility said the pond contained gypsum, a material that is captured in air pollution control devices at the coal-burning plant, and is different than the type of sludge that spilled in Tennessee. Gypsum is a naturally occurring mineral that contains calcium sulfate, which is used to make wall board, cement and fertilizer.

Gypsum is what my friend at TWRA said is used to mix with coal ash, which is then manufactured into drywall and cinder block.

Anyway, rumor has it that TVA’s Johnsonville Fossil Plant outside of Waverly, TN is operating with a sludge pond (pictured at right) which is 20 years past its life expectancy. That should set off alarm bells, considering TVA brags on the Johnsonville website that this fossil plant "consumes some 9,600 tons of coal a day."

I don't mean to alarm anyone--or hell, maybe I do--but leaks have been reported at the Johnsonville sludge pond since 2003. Also:

Newschannel 5 also learned the state reported erosion in 2006 at a dike at TVA's Cumberland Fossil Plant in Stewart County.

Gosh I feel so much better now. Not.

Meanwhile, back in May TDEC approved reissuing Johnsonville’s permit to dump

ash pond discharges, water treatment plant wastes, discharges from sump stations, discharges from metal and non-chemcial metal cleaning, discharges from coal yard drainage, and storm water runoff through Outfall 001; steam condenser cooling water, miscellaneous equipment cooling/lubricating water through Outfall 003; metal cleaning wastewater via IMP 005; intake screen backwash through Outfall 010; settled ash slurry from the main ash pond, runoff from ash stacking, and direct rainfall onto the sedimentation pond through Outfall 011; air conditioner noncontact cooling water through Outfall 013; Electrical Control Building noncontact cooling water through Outfall 017

into the Tennessee River.

I’m sure we have nothing to worry about and everything is just peachy. Really.

Lamar Alexander Destroys The Landscape

Paging Sen. Lamar Alexander! Yes, I’m talking to you, buddy. You’re shameless, you know that?

Your pitiful performance at yesterday’s TVA ash spill hearings are made all the worse when one remembers your previous jihad against wind power because you thought turbines "destroy the landscape.” Of course, it’s hard not to remember that and immediately think of your opposition to the CapeWind project on Nantucket Sound that would have interfered with the view from your $800,000 Cape Cod land.

You wanna talk about destroying the landscape? Check this out:



The first one is how they get the coal, by removing the tops of mountains.

And here’s a coal sludge pond on a good day, you know, a day where it hasn’t busted its dike and flooded a community. Do you like that landscape Sen. Alexander? Beauty truly is in the eye of the beholder.

As guess as far as those hearings yesterday goes, Alexander forgot what the word “oversight” means, because that’s what they were supposed to be about. Instead we got questions from the Senator on the cost per kilowatt hour to generate electricity, comparing coal to other means such as hydro, solar and, ooopsie daisy, wind. Guess who came out on the top end of that cost analysis? Of course, that doesn’t include the $100 million+ clean-up costs associated with an accident at just one coal fired plant. And even TVA CEO Tom Kilgore admitted that those costs are for older coal-fired plants, not new ones.

Look, I’m not a big proponent of wind power per se. I’m more of a solar girl, truth be told. But I’ve seen wind farms out West and I don’t find them especially ugly; they can be quite beautiful in a hi-tech sort of way. Not everyone has the same taste, I get that. But if you’re going to oppose a form of alternative energy, doing it on aesthetic grounds is pretty moronic when the one you’re touting is probably the ugliest blight on a landscape one could imagine, from start to finish. And let’s face it, Alexander’s economic argument just doesn’t hold water.

I’ve long believed that Lamar Alexander is one of those people who is riding a “moderate” image that is completely undeserved. He talks the talk but when push comes to shove he doesn’t walk the walk.

Here’s a brief look at his record on energy:
• Voted NO on tax incentives for energy production and conservation. (Jun 2008)
• Voted YES on removing oil & gas exploration subsidies. (Jun 2007)
• Voted YES on making oil-producing and exporting cartels illegal. (Jun 2007)
• Voted NO on factoring global warming into federal project planning. (May 2007)
• Voted NO on disallowing an oil leasing program in Alaska's ANWR. (Nov 2005)
• Voted NO on $3.1B for emergency oil assistance for hurricane-hit areas. (Oct 2005)
• Voted NO on reducing oil usage by 40% by 2025 (instead of 5%). (Jun 2005)
• Voted NO on banning drilling in the Arctic National Wildlife Refuge. (Mar 2005)
• Voted YES on Bush Administration Energy Policy. (Jul 2003)
• Voted NO on targeting 100,000 hydrogen-powered vehicles by 2010. (Jun 2003)
• Voted NO on removing consideration of drilling ANWR from budget bill. (Mar 2003)
• Keep efficient air conditioner rule to conserve energy. (Mar 2004)
• Rated 0% by the CAF, indicating opposition to energy independence. (Dec 2006)
• Open the Outer Continental Shelf for oil & gas leasing. (Jun 2008)
• Establish energy security strategy with domestic production. (Jul 2008)

And now we’re stuck with him for another six years.

Thursday, January 8, 2009

Lamar Alexander: Wanker Du Jour

It was really nice of Sen. Alexander to spend his time at these TVA hearings boosting the TVA board he helped create and touting the cost-effectiveness and other wonderful properties of “clean coal.”

No questions to Kilgore at all about how this is going to increase our utility bills. No questions about whether Mr. Kilgore might want to forego his million-dollar “incentive” bonus.

I guess Lamar has forgotten who he represents in the Senate. It sure isn’t us.

LiveBlogging TVA Hearings

Stephen Smith, Southern Alliance for Clean Energy, is now giving his opening remarks.

Smith makes a great point that TVA and the community really dodged a bullet. If the sludge pond dam had broken during the summer when the area was filled with outdoor recreationists, hundreds of lives could have been lost.

“It’s outrageous that landfills that hold our household garbage are more tightly regulated” than toxic sludge ponds. Smith calls for the orderly phase-out of wet sludge ponds.

Smith basically tells Sen. Inhofe to stuff it. I missed that part of the hearing but I assume Inhofe alleged all sorts of conflicts of interest by Smith since his group is considering a lawsuit. I wonder if Inhofe cared to mention the $157,300 in coal lobby monies he received in the last Congress alone?

I'm guessing ... not.

[UPDATE 1]:

William "Howie" Rose, Director of Emergency Management Services for Roane County, is now speaking. Rose is pointing out several flaws in TVA's emergency response plan that appear to be unique to the Kingston coal plant. He says that TVA does not utilize the same national incident management system that other emergency management agencies do, the Kingston plant does not use the same emergency perparedness program as is used at TVA's nuclear and hydro plants, and TVA also did not conduct and make available to the local community a risk assessment analysis at the plant which would have helped with emergency response.

[UPDATE 2]:

Smith is pointing out that we still don’t really know what’s in the “muck,” it’s 60 years worth of coal ash waste that flooded the surrounding community.

Sen. Boxer: We cannot forget: all of the stuff that is in this muck is so dangerous that we passed laws to get it out of our air. And now it’s in our water.

[UPDATE 3]:

Sen. Alexander: "This is a real environmental tragedy, period. But I don’t want to obscure some of the things that TVA has been doing lately that I applaud. ..."

Way to throw the softballs, Sen. Alexander! No one could have predicted that. Oh, wait. Never mind.

[UPDATE 4]:

Interesting information from Sen. Jeff Merkley, (D-ORE): The dike’s containment walls were made of ash, not clay, and trees were removed that weakened the dam.

Now Sen. Carper of Delaware is asking the witnesses to introduce any family members they may have attending the hearings. Someone give me a brick so I can bash my head in with it. What an idiotic time-waster.

Now he's quoting a Roberta Flack song. Carper is the chairman of the subcommittee that has oversight over TVA. Count me completely unimpressed. What a lightweight.

[UPDATE 5]:

Hearing is adjourned. What have we learned children? Sens. Alexander and Carper {heart} TVA. Alexander is also trying to salvage the "clean coal" slogan as it rapidly gets washed down the toilet. Barbara Boxer is concerned about children and coves. Inhofe is still an ass. The only one who impressed me was Jeff Merkley of Oregon and he's the new kid on the block.

Folks, we're screwed.

Live Streaming Senate TVA Hearings Now

C-SPAN isn't covering it but you can catch live-streaming of the hearings at WATE.com.

UPDATE: Also available on the Senate Environment & Public Works website here.

UPDATE: Okay not there. Now I'm getting a prompt that the page is down for maintenance. If I had a tinfoil hat I'd be wearing it now. Boy it sure is hard for people in Tennessee to watch these hearings. I wonder why that is?

[UPDATE] 1:

My connection sucks but sounds like Lamar Alexander just said we need a series of "mini Manhattan projects" to figure out how we can safely use coal. Throws out recapturing carbon -- Um, Senator, that's what a billion gallons of just flowed into the Emory River. The question is what do we do with it when we recapture it? It's filled with arsenic, mercury, and other poisons, and it's believed to be even more radioactive than nuclear waste.

Last night I talked with a TWRA biologist who told me they are actually selling this stuff for use with gypsum to make drywall. Drywall! Made out of radioactive toxic chemicals!! Doan want!!!!!!

[UPDATE] 2:

Well it appears if you want to watch these hearings you need to take a fucking plane to Washington DC because it appears the live stream has been yanked. Thank you, everyone, for continuing to keep us ignorant and uninformed. Hey we're just a bunch of hillbillies, who cares, right?

I think I'll go kick something now.

OK maybe it was just me .... sigh .... I really miss public access television.

[UPDATE] 3:

Lamar Alexander is questioning Tom Kilgore on the cost to produce electricity, "in the spirit of turning this from an environgmental disaster into a longterm technological opportunity." He asks what it cost per kilowatt-hour to generate electricity, including the costs of building the plants.

Kilgore's answer:

coal -- 4.5 to 5-cents per kwh, for older plants.
nuclear -- 4.2 cents
natural gas -- 10 cents
hydro -- a few dollars
solar -- they don't have a figure as they buy it from other folks
wind -- 70 cents

Now Senator Alexander is asking Kilgore if "clean coal" is possible. Of course his answer is yes. I think Sen. Alexander has an agenda here but that's just me.

[UPDATE] 4:

Sen. Barbara Boxer: You have big problems. You’ve got to clean up your act there. Literally!

What about the coves? The homeowners say you have no plans to restore the water in the coves, you just plan to cover it up. Is that what you consider a clean-up for those homeowners?

Kilgore: No, that’s not a cleanup, to be blunt. There are two coves, one had deeper water than the other. I was asked if we would make that back into an embayment. I said until we could study that I couldn’t answer that directly. I didn’t want to make a promise until I know what the best options are for the environment and the neighbors.

Boxer: But my point is, at this time you have no plans to restore those coves?

Kilgore: But we don’t not have a plan, madam chairman.

Boxer: That’s not an answer! I don’t think you’d send your grandkids out to play in an area like that.

[UPDATE] 5:

Sen. Carper (D-DEL) is now throwing softballs at Kilgore. i.e., “Let’s look at best practices in the industry for dealing with fly ash. What are things you are doing that’s cutting edge and what are others doing?”

Apropos of nothing, FollowTheCoalMoney.org says Big Coal contributed $35,000 to Carper, most of it in 2005-2006.

I don’t understand why Senators are asking about scrubbing emmissions from smoke stacks. There is still waste. This is the crap that ended up in a sludge pond that broke and polluted a huge area. Do they not get it?

TVA Gives Customers The Middle Finger

Here’s a headline that was entirely predictable, and utterly despicable:
Costs of TVA sludge spill to show on electric bills

RATEPAYERS ARE ON THE HOOK FOR CLEANUP OF TOXIC ASH SITE


TVA's ratepayers will be saddled with the cost to clean up a massive coal ash slide at an East Tennessee power plant, the agency's chairman said.

The tab, likely to be tens of millions of dollars or more, will include the cost of extra workers, overtime pay, heavy machinery, and housing and supplies for families chased from their homes, along with the lawsuits that have begun to pile up.

"This is going to get into rates sooner or later," Tennessee Valley Authority Chairman Bill Sansom told The Associated Press on Wednesday. "We haven't even thought about going to Washington for it."

First of all, “tens of millions” is wildly conservative. Steve Smith of the Southern Alliance for Clean Energy puts it more like $100 million, not including costs for things like lawsuits. Last night I spent the evening with a TWRA biologist who has been working on monitoring the site, and he estimated the cost to be more like $150 million.

But second of all: WTF?

Just a week ago we learned of the multi-million dollar bonuses TVA executives received:

According to federal documents, the CEO of TVA, Tom Kilgore, makes $655,000 a year. In addition to his salary, he received an incentive bonus of more than $1 million for 2008, bringing his total income to $2.4 million.

TVA's chief financial officer, Kimberly Green, earned a salary of $503,000 in 2008 and received a bonus of $493,000, which made for an income of $1.3 million.

William McCollum, the chief operating officer, earned $726,000, with a $751,000 bonus, for a total of $1.8 million.

Incentive bonus? Incentive for what--destroying people's lives? Destroying wildlife and water and soil?

Why are we rewarding these people with bonuses when they just destroyed a rather large area of East Tennessee? No way, no how. I want those bonuses back. You don’t get rewarded for causing the largest environmental disaster since the ExxonValdez spill.

TVA managers decided to cut corners on overdue repairs to their leaky coal ash sludge pond, going the el-cheapo spit-and-a-prayer route. The most expensive route would have been a $25 million “global fix” but that was deemed too expensive. And now we’re looking at “tens of millions of dollars”--try more like $100 million-plus--that utility customers have to pay to make up for their mistake. While TVA executives take in big bonuses for not doing their jobs.

Thanks a lot, TVA. Love you back, lots. Please, someone tell me how can I get off the grid, pronto.

Wednesday, January 7, 2009

Senate To Hold TVA Hearings Tomorrow

The U.S. Senate Committee on Environment & Public Works will hold hearings on the TVA spill Thursday, January 8, at 10:00 AM EST.

I can’t tell if C-SPAN will broadcast these hearings, since they only post today’s schedule on their website. If you’d like to see these hearings you need to fax their viewer services department at 202-737-6226 (an e-mail doesn’t appear to do the trick).

I urge everyone to take a few minutes and send C-SPAN a fax right away. I just did it and it took me 1 minute. A hand-written note will do.

Aren’t you just dying to see TVA CEO Tom Kilgore fold like a lawnchair under the brutal questioning of Tennessee Republican Senator Lamar Alexander?

Aw, who am I kidding!

But yeah, we need to see these hearings. So fax that letter, pronto. 'kay, thx, bai.